Marengo can deliver the feasibility study in half the time and at half the cost, without cutting corners.
50% lower time
6-8 weeks vs. 12-16 weeks traditional
50% lower cost
without cutting corners
36 MW of IT · 12 data halls on two storeysPlanted buffer to the houses230/34.5 kV substation · 2 × 60 MVA18 power blocks · 3 MW standby eachStormwater pond and forebay
Raw plot of land to 36 MW data center concept
Marengo can deliver the feasibility study in half the time and at half the cost, without cutting corners.
50% lower time
6-8 weeks vs. 12-16 weeks traditional
50% lower cost
without cutting corners
Point atTap a discipline to find it on the campus.
Integrate infrastructurePower, utilities, access and permitting constraints.